{"id":22478,"date":"2014-01-15T14:35:09","date_gmt":"2014-01-15T20:35:09","guid":{"rendered":"https:\/\/eshop.macsales.com\/blog\/?p=22478"},"modified":"2017-06-28T12:28:06","modified_gmt":"2017-06-28T17:28:06","slug":"solar-panel-installation-completed-at-austin-facility","status":"publish","type":"post","link":"https:\/\/eshop.macsales.com\/blog\/22478-solar-panel-installation-completed-at-austin-facility\/","title":{"rendered":"Solar Panel Installation Completed at Austin Facility"},"content":{"rendered":"<p>Since work <a href=\"https:\/\/eshop.macsales.com\/blog\/21406-owc-brings-green-attitude-to-austin-facility\">began in late 2013<\/a>, we\u2019ve been <a href=\"https:\/\/eshop.macsales.com\/blog\/21461-solar-panel-project-continues-at-owc-austin-facility\">documenting the progress<\/a> of the Solar panel installation on the roof of our OWC facility in Austin, Texas. And we\u2019re happy to report that the project has been completed and the panels are being prepped for activation.<\/p>\n<p>The efficient panels will harness light energy from the sun and are expected to provide no less than 32 percent of the building\u2019s annual power consumption with excess power put out onto the grid. As you can see below, the <a href=\"http:\/\/everest-solarsystems.com\/en-US\/start\">state-of-the-art mounts<\/a> for the panels use a unique teepee shape that maximizes energy harvest by eliminating shading between module rows.<\/p>\n<figure id=\"attachment_22479\" aria-describedby=\"caption-attachment-22479\" style=\"width: 614px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/eshop.macsales.com\/blog\/wp-content\/uploads\/2014\/01\/SolarFinalPic.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-22479 \" src=\"https:\/\/eshop.macsales.com\/blog\/wp-content\/uploads\/2014\/01\/SolarFinalPic-1024x768.jpg\" alt=\"OWC solar panel project for its Austin facility is fully installed. (Click to enlarge)\" width=\"614\" height=\"461\" \/><\/a><figcaption id=\"caption-attachment-22479\" class=\"wp-caption-text\">OWC&#8217;s solar panel project for its Austin facility is fully installed. (Click to enlarge)<\/figcaption><\/figure>\n<p><!--more-->The addition of the solar panels to our Austin facility is just another step in OWC\u2019s continued environmental efforts. We\u2019ve also installed a special dual-reflective window film that blocks up to 66 percent of the sun\u2019s heat to keep the building more comfortable and more efficient. And we will be adding high-efficiency air-conditioning units to the building.<\/p>\n<p>But our efforts for minimizing our footprint aren&#8217;t just contained to Austin. From our <a href=\"https:\/\/eshop.macsales.com\/green\/index.html\">LEED Platinum Certified headquarters<\/a> in Woodstock, Ill. to our on-site <a href=\"https:\/\/eshop.macsales.com\/green\/wind.html\">Vestas V39-500 kW wind turbine<\/a>, we have made a company-wide commitment to energy conservation and environmental leadership. And we will continue to maintain that commitment for years to come!<\/p>\n<p><strong>Check out our related OWC Austin Solar array articles:<\/strong><\/p>\n<ul>\n<li><a href=\"https:\/\/eshop.macsales.com\/blog\/21406-owc-brings-green-attitude-to-austin-facility\">eshop.macsales.com\/blog\/21406-owc-brings-green-attitude-to-austin-facility<\/a><\/li>\n<li><a href=\"https:\/\/eshop.macsales.com\/blog\/21461-solar-panel-project-continues-at-owc-austin-facility\">eshop.macsales.com\/blog\/21461-solar-panel-project-continues-at-owc-austin-facility<\/a><\/li>\n<li><a href=\"https:\/\/eshop.macsales.com\/blog\/21656-solar-panel-project-nears-completion-at-owc-austin\">eshop.macsales.com\/blog\/21656-solar-panel-project-nears-completion-at-owc-austin<\/a><\/li>\n<li><a href=\"https:\/\/eshop.macsales.com\/blog\/22653-its-on-owc-harnessing-the-texas-sun\">eshop.macsales.com\/blog\/22653-its-on-owc-harnessing-the-texas-sun<\/a><\/li>\n<li><a href=\"https:\/\/eshop.macsales.com\/blog\/23244-solar-power-shines-in-2013-with-record-breaking-numbers\">eshop.macsales.com\/blog\/23244-solar-power-shines-in-2013-with-record-breaking-numbers<\/a><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Since work began in late 2013, we\u2019ve been documenting the progress of the Solar panel installation on the roof of our OWC facility in Austin, Texas. And we\u2019re happy to report that the project has been completed and the panels are being prepped for activation. The efficient panels will harness light energy from the sun [&hellip;]<\/p>\n","protected":false},"author":16,"featured_media":22479,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"spay_email":"","footnotes":""},"categories":[102,3765],"class_list":["post-22478","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-green","category-owc-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v20.2 (Yoast SEO v20.2) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Solar Panel Installation Completed at Austin Facility<\/title>\n<meta name=\"description\" content=\"Solar Panel Installation Completed at Austin Facility\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/eshop.macsales.com\/blog\/22478-solar-panel-installation-completed-at-austin-facility\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Solar Panel Installation Completed at Austin Facility\" \/>\n<meta property=\"og:description\" content=\"Solar Panel Installation Completed at Austin Facility\" \/>\n<meta property=\"og:url\" content=\"https:\/\/eshop.macsales.com\/blog\/22478-solar-panel-installation-completed-at-austin-facility\/\" \/>\n<meta property=\"og:site_name\" content=\"Rocket Yard\" \/>\n<meta property=\"article:author\" content=\"https:\/\/www.facebook.com\/PoweredbyOWC\/\" \/>\n<meta property=\"article:published_time\" content=\"2014-01-15T20:35:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-06-28T17:28:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eshop.macsales.com\/blog\/wp-content\/uploads\/2014\/01\/SolarFinalPic.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1400\" \/>\n\t<meta property=\"og:image:height\" content=\"1050\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"OWC Newsfeed\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@https:\/\/twitter.com\/poweredbyOWC\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"OWC Newsfeed\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/eshop.macsales.com\/blog\/22478-solar-panel-installation-completed-at-austin-facility\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/eshop.macsales.com\/blog\/22478-solar-panel-installation-completed-at-austin-facility\/\"},\"author\":{\"name\":\"OWC Newsfeed\",\"@id\":\"https:\/\/eshop.macsales.com\/blog\/#\/schema\/person\/3ba79aedbd7ad1c0c4c8a33295f0c45b\"},\"headline\":\"Solar Panel Installation Completed at Austin Facility\",\"datePublished\":\"2014-01-15T20:35:09+00:00\",\"dateModified\":\"2017-06-28T17:28:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/eshop.macsales.com\/blog\/22478-solar-panel-installation-completed-at-austin-facility\/\"},\"wordCount\":284,\"commentCount\":3,\"publisher\":{\"@id\":\"https:\/\/eshop.macsales.com\/blog\/#organization\"},\"keywords\":[\"Austin\",\"Green\",\"LEED Platinum Certified\",\"OWC\",\"solar panels\",\"wind turbine\"],\"articleSection\":[\"Green\",\"OWC News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/eshop.macsales.com\/blog\/22478-solar-panel-installation-completed-at-austin-facility\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/eshop.macsales.com\/blog\/22478-solar-panel-installation-completed-at-austin-facility\/\",\"url\":\"https:\/\/eshop.macsales.com\/blog\/22478-solar-panel-installation-completed-at-austin-facility\/\",\"name\":\"Solar Panel Installation Completed at Austin Facility\",\"isPartOf\":{\"@id\":\"https:\/\/eshop.macsales.com\/blog\/#website\"},\"datePublished\":\"2014-01-15T20:35:09+00:00\",\"dateModified\":\"2017-06-28T17:28:06+00:00\",\"description\":\"Solar Panel Installation Completed at Austin Facility\",\"breadcrumb\":{\"@id\":\"https:\/\/eshop.macsales.com\/blog\/22478-solar-panel-installation-completed-at-austin-facility\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/eshop.macsales.com\/blog\/22478-solar-panel-installation-completed-at-austin-facility\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/eshop.macsales.com\/blog\/22478-solar-panel-installation-completed-at-austin-facility\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/eshop.macsales.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Solar Panel Installation Completed at Austin Facility\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/eshop.macsales.com\/blog\/#website\",\"url\":\"https:\/\/eshop.macsales.com\/blog\/\",\"name\":\"Rocket Yard\",\"description\":\"Your source for expert tips, special deals, commentary, reviews, and the latest tech news.\",\"publisher\":{\"@id\":\"https:\/\/eshop.macsales.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/eshop.macsales.com\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/eshop.macsales.com\/blog\/#organization\",\"name\":\"OWC\",\"url\":\"https:\/\/eshop.macsales.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eshop.macsales.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/eshop.macsales.com\/blog\/wp-content\/uploads\/2020\/06\/rocket-yard-logo-round.png\",\"contentUrl\":\"https:\/\/eshop.macsales.com\/blog\/wp-content\/uploads\/2020\/06\/rocket-yard-logo-round.png\",\"width\":1024,\"height\":1024,\"caption\":\"OWC\"},\"image\":{\"@id\":\"https:\/\/eshop.macsales.com\/blog\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/eshop.macsales.com\/blog\/#\/schema\/person\/3ba79aedbd7ad1c0c4c8a33295f0c45b\",\"name\":\"OWC Newsfeed\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/eshop.macsales.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/9f1110b1b2f58a5e0ff99b6ac1cb93dbf853e7848b2c0d0855b7aa63698c9674?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/9f1110b1b2f58a5e0ff99b6ac1cb93dbf853e7848b2c0d0855b7aa63698c9674?s=96&d=mm&r=g\",\"caption\":\"OWC Newsfeed\"},\"description\":\"The OWC Newsfeed provides the latest OWC, MacSales.com, Rocket Yard, and industry news, information, and announcements for your reading pleasure and shareability!\",\"sameAs\":[\"http:\/\/www.owc.com\",\"https:\/\/www.facebook.com\/PoweredbyOWC\/\",\"https:\/\/www.pinterest.com\/owcmacsales\/\",\"https:\/\/twitter.com\/https:\/\/twitter.com\/poweredbyOWC\",\"https:\/\/www.youtube.com\/user\/OWCmacsales?sub_confirmation=1\"],\"url\":\"https:\/\/eshop.macsales.com\/blog\/author\/owc-newsfeed\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Solar Panel Installation Completed at Austin Facility","description":"Solar Panel Installation Completed at Austin Facility","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/eshop.macsales.com\/blog\/22478-solar-panel-installation-completed-at-austin-facility\/","og_locale":"en_US","og_type":"article","og_title":"Solar Panel Installation Completed at Austin Facility","og_description":"Solar Panel Installation Completed at Austin Facility","og_url":"https:\/\/eshop.macsales.com\/blog\/22478-solar-panel-installation-completed-at-austin-facility\/","og_site_name":"Rocket Yard","article_author":"https:\/\/www.facebook.com\/PoweredbyOWC\/","article_published_time":"2014-01-15T20:35:09+00:00","article_modified_time":"2017-06-28T17:28:06+00:00","og_image":[{"width":1400,"height":1050,"url":"https:\/\/eshop.macsales.com\/blog\/wp-content\/uploads\/2014\/01\/SolarFinalPic.jpg","type":"image\/jpeg"}],"author":"OWC Newsfeed","twitter_card":"summary_large_image","twitter_creator":"@https:\/\/twitter.com\/poweredbyOWC","twitter_misc":{"Written by":"OWC Newsfeed","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/eshop.macsales.com\/blog\/22478-solar-panel-installation-completed-at-austin-facility\/#article","isPartOf":{"@id":"https:\/\/eshop.macsales.com\/blog\/22478-solar-panel-installation-completed-at-austin-facility\/"},"author":{"name":"OWC Newsfeed","@id":"https:\/\/eshop.macsales.com\/blog\/#\/schema\/person\/3ba79aedbd7ad1c0c4c8a33295f0c45b"},"headline":"Solar Panel Installation Completed at Austin Facility","datePublished":"2014-01-15T20:35:09+00:00","dateModified":"2017-06-28T17:28:06+00:00","mainEntityOfPage":{"@id":"https:\/\/eshop.macsales.com\/blog\/22478-solar-panel-installation-completed-at-austin-facility\/"},"wordCount":284,"commentCount":3,"publisher":{"@id":"https:\/\/eshop.macsales.com\/blog\/#organization"},"keywords":["Austin","Green","LEED Platinum Certified","OWC","solar panels","wind turbine"],"articleSection":["Green","OWC News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/eshop.macsales.com\/blog\/22478-solar-panel-installation-completed-at-austin-facility\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/eshop.macsales.com\/blog\/22478-solar-panel-installation-completed-at-austin-facility\/","url":"https:\/\/eshop.macsales.com\/blog\/22478-solar-panel-installation-completed-at-austin-facility\/","name":"Solar Panel Installation Completed at Austin Facility","isPartOf":{"@id":"https:\/\/eshop.macsales.com\/blog\/#website"},"datePublished":"2014-01-15T20:35:09+00:00","dateModified":"2017-06-28T17:28:06+00:00","description":"Solar Panel Installation Completed at Austin Facility","breadcrumb":{"@id":"https:\/\/eshop.macsales.com\/blog\/22478-solar-panel-installation-completed-at-austin-facility\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/eshop.macsales.com\/blog\/22478-solar-panel-installation-completed-at-austin-facility\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/eshop.macsales.com\/blog\/22478-solar-panel-installation-completed-at-austin-facility\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/eshop.macsales.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Solar Panel Installation Completed at Austin Facility"}]},{"@type":"WebSite","@id":"https:\/\/eshop.macsales.com\/blog\/#website","url":"https:\/\/eshop.macsales.com\/blog\/","name":"Rocket Yard","description":"Your source for expert tips, special deals, commentary, reviews, and the latest tech news.","publisher":{"@id":"https:\/\/eshop.macsales.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/eshop.macsales.com\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/eshop.macsales.com\/blog\/#organization","name":"OWC","url":"https:\/\/eshop.macsales.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eshop.macsales.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/eshop.macsales.com\/blog\/wp-content\/uploads\/2020\/06\/rocket-yard-logo-round.png","contentUrl":"https:\/\/eshop.macsales.com\/blog\/wp-content\/uploads\/2020\/06\/rocket-yard-logo-round.png","width":1024,"height":1024,"caption":"OWC"},"image":{"@id":"https:\/\/eshop.macsales.com\/blog\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/eshop.macsales.com\/blog\/#\/schema\/person\/3ba79aedbd7ad1c0c4c8a33295f0c45b","name":"OWC Newsfeed","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eshop.macsales.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/9f1110b1b2f58a5e0ff99b6ac1cb93dbf853e7848b2c0d0855b7aa63698c9674?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9f1110b1b2f58a5e0ff99b6ac1cb93dbf853e7848b2c0d0855b7aa63698c9674?s=96&d=mm&r=g","caption":"OWC Newsfeed"},"description":"The OWC Newsfeed provides the latest OWC, MacSales.com, Rocket Yard, and industry news, information, and announcements for your reading pleasure and shareability!","sameAs":["http:\/\/www.owc.com","https:\/\/www.facebook.com\/PoweredbyOWC\/","https:\/\/www.pinterest.com\/owcmacsales\/","https:\/\/twitter.com\/https:\/\/twitter.com\/poweredbyOWC","https:\/\/www.youtube.com\/user\/OWCmacsales?sub_confirmation=1"],"url":"https:\/\/eshop.macsales.com\/blog\/author\/owc-newsfeed\/"}]}},"jetpack_featured_media_url":"https:\/\/eshop.macsales.com\/blog\/wp-content\/uploads\/2014\/01\/SolarFinalPic.jpg","jetpack_shortlink":"https:\/\/wp.me\/pmPaT-5Qy","_links":{"self":[{"href":"https:\/\/eshop.macsales.com\/blog\/wp-json\/wp\/v2\/posts\/22478","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eshop.macsales.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eshop.macsales.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eshop.macsales.com\/blog\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/eshop.macsales.com\/blog\/wp-json\/wp\/v2\/comments?post=22478"}],"version-history":[{"count":18,"href":"https:\/\/eshop.macsales.com\/blog\/wp-json\/wp\/v2\/posts\/22478\/revisions"}],"predecessor-version":[{"id":41557,"href":"https:\/\/eshop.macsales.com\/blog\/wp-json\/wp\/v2\/posts\/22478\/revisions\/41557"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eshop.macsales.com\/blog\/wp-json\/wp\/v2\/media\/22479"}],"wp:attachment":[{"href":"https:\/\/eshop.macsales.com\/blog\/wp-json\/wp\/v2\/media?parent=22478"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eshop.macsales.com\/blog\/wp-json\/wp\/v2\/categories?post=22478"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}